Skip to main content Skip to footer
Coachella Valley Model Railroaders
  • Home
  • About Us
  • Indio
  • Revised Club Videos
  • Club Links
  • Members
  • In Memory
  • Fun Time Articles
  • Photos
  • Places We Do Business With
  • Train Rides
  • Article of Interest
  • New Extension 2020
  • Resources
  • Manufacturer and Decoder Contact Numbers
  • Contact Us
  • Home
  • About Us
  • Indio
  • Revised Club Videos
  • Club Links
  • Members
  • In Memory
  • Fun Time Articles
  • Photos
  • Places We Do Business With
  • Train Rides
  • Article of Interest
  • New Extension 2020
  • Resources
  • Manufacturer and Decoder Contact Numbers
  • Contact Us
(760) 318-5602
Coachella Valley Model Railroaders
  • Home
  • About Us
  • Indio
  • Revised Club Videos
  • Club Links
  • Members
  • In Memory
  • Fun Time Articles
  • Photos
  • Places We Do Business With
  • Train Rides
  • Article of Interest
  • New Extension 2020
  • Resources
  • Manufacturer and Decoder Contact Numbers
  • Contact Us
  • Home
  • About Us
  • Indio
  • Revised Club Videos
  • Club Links
  • Members
  • In Memory
  • Fun Time Articles
  • Photos
  • Places We Do Business With
  • Train Rides
  • Article of Interest
  • New Extension 2020
  • Resources
  • Manufacturer and Decoder Contact Numbers
  • Contact Us
Coachella Valley Model Railroaders
  • Home
  • About Us
  • Indio
  • Revised Club Videos
  • Club Links
  • Members
  • In Memory
  • Fun Time Articles
  • Photos
  • Places We Do Business With
  • Train Rides
  • Article of Interest
  • New Extension 2020
  • Resources
  • Manufacturer and Decoder Contact Numbers
  • Contact Us
(760) 318-5602
Coachella Valley Model Railroaders
  • Home
  • About Us
  • Indio
  • Revised Club Videos
  • Club Links
  • Members
  • In Memory
  • Fun Time Articles
  • Photos
  • Places We Do Business With
  • Train Rides
  • Article of Interest
  • New Extension 2020
  • Resources
  • Manufacturer and Decoder Contact Numbers
  • Contact Us
  • Home
  • About Us
  • Indio
  • Revised Club Videos
  • Club Links
  • Members
  • In Memory
  • Fun Time Articles
  • Photos
  • Places We Do Business With
  • Train Rides
  • Article of Interest
  • New Extension 2020
  • Resources
  • Manufacturer and Decoder Contact Numbers
  • Contact Us
(760) 318-5602
New Extension 2020

Photos of Our 2020 Model Railroad Layout Extension

Just needs ballasting and brush
  • Area where the 2020 extension will be
    Area where the 2020 extension will be
  • For the long sections of track, we use the Proses ballast spreader.
    For the long sections of track, we use the Proses ballast spreader.
  • For the long sections of track, we use the Proses ballast spreader.
    For the long sections of track, we use the Proses ballast spreader.
  • Looking South on the new extension
    Looking South on the new extension
  • Adding ground scenery, more to be added
    Adding ground scenery, more to be added
  • After we use the Proses ballast spreader, we like to use a 1” foam pad brush to help distribute the ballast evenly along the tracks. As you can see in the picture, just a light slide along the rail moves the excess ballast off the ties over to the slope. This distributes the ballast nicely and evenly onto the slope. The rails just above the sponge brush still need to be done.
    After we use the Proses ballast spreader, we like to use a 1” foam pad brush to help distribute the ballast evenly along the tracks. As you can see in the picture, just a light slide along the rail moves the excess ballast off the ties over to the slope. This distributes the ballast nicely and evenly onto the slope. The rails just above the sponge brush still need to be done.
  • Painted the pole black to help camouflage the white pole. This is where the Ready Kilowatt building will go.
    Painted the pole black to help camouflage the white pole. This is where the Ready Kilowatt building will go.
  • This is a flicker light unit out of one of those flameless candles. We see potential for using it on the layout.
    This is a flicker light unit out of one of those flameless candles. We see potential for using it on the layout.
  • Scenery coming right along
    Scenery coming right along
  • Weights placed until glue dries
    Weights placed until glue dries
  • Placement of road/grade crossing
    Placement of road/grade crossing
  • Jim installing road/grade crossing
    Jim installing road/grade crossing
  • Sign being assembled
    Sign being assembled
  • Alex assembling the sign for the power plant
    Alex assembling the sign for the power plant
  • Jim and Robert working on the town
    Jim and Robert working on the town
  • Robert doing painting detail
    Robert doing painting detail
  • Sign for the power plant headquarters
    Sign for the power plant headquarters
  • Alex applying groundcover
    Alex applying groundcover
  • Alex sifting dirt for ground cover
    Alex sifting dirt for ground cover
  • Applying ballast and ground cover
    Applying ballast and ground cover
  • New wall at the rear of the buildings
    New wall at the rear of the buildings
  • Eddy, our boss relaxing
    Eddy, our boss relaxing
  • Power company headquarters
    Power company headquarters
  • Location of new power-generating station
    Location of new power-generating station
  • Fence installed
    Fence installed
  • Material for chain link fence
    Material for chain link fence
  • View of bridge and road going into town
    View of bridge and road going into town
  • New highway bridge
    New highway bridge
  • Oil storage tanks on the new extension
    Oil storage tanks on the new extension
  • Starting to scenic the new extension
    Starting to scenic the new extension
  • Overview of paintball park
    Overview of paintball park
  • New paintball park
    New paintball park
  • New panel lit up
    New panel lit up
  • New panel for the extension yard
    New panel for the extension yard
  • Alex installing the fence railing
    Alex installing the fence railing
  • Setting new fence posts
    Setting new fence posts
  • How we solder the feeds to the rails
    How we solder the feeds to the rails
  • Track feed wires
    Track feed wires
  • Where the Hulett off-loader will be
    Where the Hulett off-loader will be
  • Installing track
    Installing track
  • Setting out where buildings will go
    Setting out where buildings will go
  • Building the new tables
    Building the new tables
  • Material for the new tables
    Material for the new tables
 <p>© <?php echo date("Y") . " • ";?>
   <a href="<?php echo get_home_url(); ?>">
     <?php echo get_bloginfo( 'name' );?>
     </a> • All rights reserved.
 </p>
Coachella Valley Model Railroaders
Club Address
Crafts and Hobbies Building, Riverside County Fair and National Date Festival Fairgrounds
82503 Highway 111
Indio, CA 92201-5633
Hours of Operation
Wednesdays from 2 PM–6 PM and Saturdays from 10 AM–2 PM | Other Days and Times Are by
Appointment

We are closed for visitation from June 1st to October 1st.

Phone

(760) 318-5602

Email

info@cvmrr.com

© 2026 • Coachella Valley Model Railroaders • All rights reserved.